Vadodara Enviro ChannelLtd.

Vadodara Enviro ChannelLtd.

Year Built In

2016-2017

Project type

RCC Pipe with FRP Liner

Project Cost(in lacs)

275.62

Providing and Laying Precast Concrete Pipe 1400mm NP3 Class Pipe (Unreinforced) with 0.60mm Calpolic Lining in between Vedach to Piludara Cross Road, VECL.