Vadodara Enviro ChannelLtd.

Vadodara Enviro ChannelLtd.

Year Built In

2014-2014

Project type

RCC Pipe with HDPE Liner

Project Cost(in lacs)

541.68

Providing and Laying Vertical cast precast pipe 1400mm NP3 Class Pipeline with HDPE Lining in between Village Uber to Nodhana Section for Conveyance System.